Wind Turbine, Old Whittington Waste Water Treatment Works Chesterfield

JPG were appointed to undertake the structural and civil engineering design for the installation of a 54-metre high wind turbine situated within a water treatment works.

Due to the site’s location, access was limited. Historical mine workings created another challenge for this complicated project.

As part of our civil engineering appointment, JPG designed the wind turbine foundations and undertook swept path analysis for the bespoke vehicles required to transport the wind turbine to the site.

JPG advised on the regrading of slopes and widening of internal tracks to grant site access.

CLIENT: Peter Duffy Limited