Royal Atlantis Warehouse

The development consists of a proposed new warehouse and bus stop facility at Atlantis the Palm, Dubai. The proposed warehouse construction comprises a steel portal framed building supported on isolated pad foundations. The bus stop building comprises insitu reinforced concrete superstructure supported on isolated pad foundations.

JPG role was to carry out a Structural Tender Elevation report to verify the validity of the structural design undertaken by others, and to advise on any ground improvement requirements.

As part of our review process we were able to construct 3D building analysis models and obtain design loads that could be used to verify the proposed design. In doing so we were able to provide some value engineering solutions in the form of alternative foundation solutions.

Client: Al Futtaim, Carillion