Bretton Park

This former gasworks site presented significant environmental challenges and required substantial remediation in order to prepare the site for development. Ex situ bioremediation was selected with the treated material being returned to the site as engineering fill.

Due to the need to maximise development density, pre-cast concrete box culverts were selected to attenuate the surface water run-off prior to this being discharged to the adjacent River Calder.

Client: Clugston Estates Limited/PPG Land Limited